a) Construction of New Ghats
in Godavari River and Development Works in the Surrounding Area of River.
It is proposed to construct new
ghat between Devi-Sandwa and Rokdaba Sandwa and to concrete the
river bed up to Talkuteshwar Bridge. It is also proposed to develop
reservations shown in development plan for parking, open space, public
utility places, vegetable markets etc. in Panchavati area around various
pilgrim centres.
b) Construction of Shahi Marg from Gadge Maharaj
Bridge to Godavari Patangan.
Since the proposed parking is on
the downstream of Gadge Maharaj Bridge, the pedestrian movement will
be from Gadge Maharaj Bridge to Ramkund. To enhance and highlight this
pedestrian movement, the Shahi Marg is proposed, which incorporates
the Kurma-avtar and Sheshnag as paving patterns.
|
|
|
|
| Existing View of Ramkund |
|
Existing View of Godavari Area Ghat |
|
|
|
|
| Proposed Extension of Ramkund |
|
Perspective View of Godavari Area Ghat |
c) Development of Pedestrian Access from Left
& Right Sides of Ahilayabai Holkar Bridge to the Holy Stretch.
Today there is no access from Ahilyabal
Holkar Bridge to the Ramkund. Hence people come to the holy stretch
from Gadge Maharaj Bridge or Ramsetu Bridge. This creates
a lot of congestion. To divert the flow of pedestrians and to decongest
the area, two separate footpaths have been proposed from both the sides
of the Holkar Bridge.
d) Development of Parking Area near Ramkund
The existing parking area houses
all categories of vehicles right from cycles to tourist buses. The tourist
buses misuse the parking area for cooking and as toilets. This, in turn,
is disposed in the Gopikabai Tas which directly flows to Ramkund.
Hence to avoid this source of pollution and to decongest the area, reorganisation
of parking taking advantage of the existing topography, is proposed.
At the same time, shifting of the heavy vehicular parking on the downstream
of Gadge Maharaj Bridge is also proposed.
|
|
|
|
| Concreting work of Gauri Patangan |
|
Development of Various Ghats |
e) Arrangement for providing
treated water supply for Ramkund.
Today Ramkund contains stagnated
water between the period of two irrigation rotation. The gap between
two irrigation rotation is 1 month. The waterstagnationfora period of
one month results in decay of the floating and other matter. The alternate
day cleaning of Ramkund helps in removal of decaying material but not
the aeration. The proposed arrangement will provide treated water to
Ramkund.
f) Extension to Ramkund.
In Kumbhamela the holiest spot is
Ramkund where Godavari river takes its bend southwards. The water of
Ramkund and Trimbak are always sacred as per Puranas. But in the Sinhastha
year its water is said to have special purifying power So many pilgrims
from all over the country come to take holy dip in Ramkund and the existing
Ramkund is very small to accommodate the huge number of pilgrims. Thus
the extension of Ramkund is proposed towards south. The extended Ramkund
admeasures approximately 68m x 25m where the existing Ramkund admeasures
only about 28m x 13.5m. Thus the total 2078 Sq.Mtr. area will be available
to take "SHAHI SNAN".
g) Development of new Ghata from Devi Sandwa
to Talkuteshwar Sandwa.
The existing length of holy stretch
is 700 Rmt. It is proposed to construct new ghat from D&i Sandwa to
Talkuteshwar bridge and concreting of river bed up to bridge etc. The
total length of ghat will be 2.1 Kms. Thus lbs additional ghat area
Will be useful 10 accommodate and reorganise the pilgrims.
Kapila Ghat Work in Progress
Visit of Principal Secretary (Planning)
|
h)
Development of Godavari Kaplia Sangam Ghat at Tapovan.
The tributary river Kapila
joins river Godavari in Tapovan. This river is in a natural beautiful
setting but is neglected in spite of its strong historical background.
Thus it is proposed to signify the historical importance by developing
a ghat at Kapila river.
|
i) Development of Waghadi
Nalla, Waghadi Park
1) Construction of Festive Route
- for the pilgrims and ascetics coming from Tapovan to Rarnkund.
2) Horticulture development - to
provide resting areas km pilgrims to have lunch and other activities.
3)Diversion of water and other related
development.
There are several routes leading to the holy stretch from Tapovan. One
of the proposed route is from Waghadi Nalla. This festive route will
serve as resting place for the pilgrims and ascetics during the Sinhastha.
j) Development of Godavari Patangan
To accommodate the increasing number
of people at the time of Sinhastha Kumbhamela, the Godavari Patangan
will be developed.
k) Construction of Community Toilets
During Kumbhamela and throughout
the year Pilgrims visit the Ramkund area and Tapovan area. It is necessary
to provide toilet facilities at various places in Panchavati area so
as to keep these areas in hygienic condition. It is Therefore proposed
to construct 5 community toilet blocks at the required places.
l) Providing Accommodation Facility at Tapovan.
It is anticipated that two lakh
Sadhus and Saints will gather for Sinhastha Kumbhamela. The stay of
these Sadhus and Saints will be for one year. To provide accommodation
facilities for them, it is proposed to construct dormitories at Tapovan.
List of Works Alongwith
Estimated Costs
|